Two story building fully renovated outside and inside. Work include roof repair, replace of all wooden windows with new wooden windows, install bathroom on the 2nd floor, new el. system with new fuse box, new pluming, install septic tank, plastering inside and painting outside, new wooden floorboards, repair internal wooden doors, new kitchen install, install BBQ area, install wood burning stove.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Final stage
2 years after final Stage