Total renovation near Burgas

Two story fully renovated outside and inside building with barn detached to the house converted to living condition. Work include brand new roof, replace of all wooden windows with new brown UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new internal wooden doors, new reinforced concrete floors and tiling, new wooden floorboards, new kitchen install, plastering inside and outside, install stairs from 2nd floor down to the detached barn, install wood burning stove.

Photo gallery during the construction work