Two story fully renovated outside and inside building. Work include brand new roof, replace of all wooden windows with new white UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new internal wooden doors, new reinforced concrete floors and tiling, new wooden floorboards, new kitchen install, plastering inside and outside, painting inside and outside, creating new terrace on 2nd floor, install central heating system.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Stage 11
Stage 12
Stage 13
Stage 14
Stage 15
Stage 16
Stage 17
Stage 18
Final Stage