Two story building fully renovated outside and inside. Install brand new roof with new gutter system, new sofits and fascia boards as well, replace of all windows with new white UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new wooden spiral internal stairs, install plasterboards on wall and ceilings internal and painting, install external insolation, plastering and painting, new floorboards on 2nd floor, tiling on the ground floor, make old external staircase internal, with brick work and roof above.