Two story building fully renovated outside and inside. Work include roof repair, new guttering system, new roof sofits and front fascia board, replace of all wooden windows with new white UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new wooden internal doors, new kitchen, plastering and painting inside and outside, new flooring, install black burning heater, install wooden metal railings on the external stairs and build up external wooden terrace, install internal wooden stairs with railings.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Final stage