Two story building fully renovated inside and outside. Work include roof repair and new guttering system, replace of all wooden windows with new white UPVC windows, install new bathroom, new el. system with new fuse box, new pluming, install septic tank, plastering and painting inside and outside, new internal concrete stairs with wooden railings, new internal wooden doors, kitchen install, new floors (floorboards and tiling).
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Stage 11
Stage 12
Stage 13
Stage 14
Final stage