Two story building fully renovated inside. Work include replace all wooden windows with new brown UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom with glass block wall, repair existing wooden doors, new L-shape kitchen, install plasterboard on walls and ceilings on both floors, new flooring (floorboards and tailings), install fireplace, install wooden internal staircase, install new concrete terrace on one of the upper floor bedroom, tiling terrace and install wooden railings.

Before the start


Stage 1


Stage 2


Stage 3


Stage 4


Stage 5


Stage 6


Stage 7


Stage 8


Stage 9


Stage 10


Stage 11


Stage 12


Stage 13


Stage 14


Stage 15


Final stage