Three story building fully renovated inside and outside. Work include roof repair, new metal guttering system with down pipes, replace all wooden windows with new white UPVC double glazed windows, new 3 phase el. system with new fuse boxes on each floor, new pluming for two toilets and 4 bathrooms, install septic tank, install new bathroom and toilets, install new internal MDF doors, install plasterboard on walls and ceilings on all 3 floors and painting, install security bars on ground floor, sanding existing floorboards, new wooden railings for internal staircase, outside rendering and painting.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Stage 11
Stage 12
Stage 13
Stage 14
Stage 15
Stage 16
Stage 17
Stage 18
Stage 19
Stage 20
Stage 21
Stage 22
Stage 23
Stage 24
Stage 25
Stage 26
Stage 27
Stage 28
Stage 29
Final stage