Three story building fully renovated inside and outside. Work include roof repair, new metal guttering system with down pipes, replace all wooden windows with new white UPVC double glazed windows, new 3 phase el. system with new fuse boxes on each floor, new pluming for two toilets and 4 bathrooms, install septic tank, install new bathroom and toilets, install new internal MDF doors, install plasterboard on walls and ceilings on all 3 floors and painting, install security bars on ground floor, sanding existing floorboards, new wooden railings for internal staircase, outside rendering and painting.