Two story building fully renovated outside and inside. It is include roof repair, replace of all wooden windows with new UPVC double glazed windows, install concrete plate between ground floor and 2nd floor, new el. system with new fuse box, new pluming, install septic tank, new bathroom, plastering inside and outside, new flooring, install internal staircase, new internal doors.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Final Stage
2 years after renovation