Two story building fully renovated outside and inside. Work include brand new roof, replace of all wooden windows with new white UPVC windows, install new bathroom, new el. system with new fuse box, new pluming, install septic tank, plastering and painting inside and outside, new internal wooden stairs with wooden railings, new internal wooden doors, new kitchen install, install fireplace.