Two story building fully renovated inside. Work include roof repair, replace of all wooden windows with new white UPVC windows, install new bathroom, new el. system with new fuse box, new pluming, install septic tank, plastering and painting inside, opening of new arch way between two rooms, new internal wooden stairs with wooden railings, new internal wooden doors, new kitchen install, install central heating system, install metal railing on terrace.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Stage 11
Stage 12
Stage 13
Stage 14
Stage 15
Stage 16
Final stage