Two story building fully renovated outside and inside. Work include roof repair, replace of all wooden windows with new brown UPVC double glazed windows, install concrete plate between ground floor and 2nd floor, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new internal doors, new kitchen install, plastering inside and outside, new flooring, install central heating system, BBQ area.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Stage 11
Stage 12
Stage 13
Stage 14
Stage 15
Stage 16
Stage 17
Stage 18
Stage 19
Final Stage
1 year after final Stage