Old barn converted into Mezzanine near Chirpan. Work include brand new roof, creating and install brown UPVC windows, install new bathroom and utility room, creating 2nd floor level above bathroom and utility room, install new internal wooden stairs to 2nd level and wooden railings, new el. system with new fuse box, new pluming, install septic tank, pointing stone work externally and internally, install new internal wooden doors, new kitchen install, install central heating system, install new guttering system and pathway around the house.
Photo gallery during the construction work
Before the start
Stage 1 – 3D planing
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Final stage
1 year after final stage