Total renovation near Burgas

Two story building fully renovated outside and inside. Work include brand new roof, replace of all wooden windows with new white UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom on ground floor and 2nd floor, new wooden internal doors, new kitchen install, plasterboarding all walls and painting them inside and plastering and painting outside, new flooring (tiles on ground floor and wooden floorboards on 2nd floor), install central heating system with fireplace0, converting external staircase in to internal and build roof above this area, drilling for water well.

Photo gallery during the construction work

Before the start


Stage 1


Stage 2


Stage 3


Stage 4


Stage 5


Stage 6


Stage 7


Stage 8


Stage 9


Stage 10


Stage 11


Stage 12


Stage 13


Stage 14 – Water well drilling


Final stage