Two story building fully renovated outside and inside. Work include roof repair, replace of all wooden windows with new brown UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new wooden internal doors, new kitchen install, plastering and painting inside and painting outside, new flooring, install central heating system with fireplace, install new metal railings on the external stairs.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Final stage