Total renovation near Chirpan


Two story building fully renovated outside and inside. Repair of garage, build new BBQ area with roof above, roof repair on main house, replace of all windows with new brown UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new wooden internal doors, new kitchen install, plastering and painting inside and plastering and painting outside, new flooring, install  fireplace, build external wooden terrace with roof above.

Photo gallery during the construction work

Before the start


Stage 1


Stage 2


Stage 3


Stage 4


Stage 5


Stage 6


Stage 7


Stage 8


Stage 9


Stage 10


Final stage


1 year after final stage