Two story building fully renovated outside and inside. Work include roof repair, new guttering system, new roof sofits and front fascia board, replace of all wooden windows with new white UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new wooden internal doors, new kitchen install, plastering and painting inside and outside, new flooring, install central heating system, install new metal railings on the external stairs, install metal bars on all external windows and doors, install drainage system around the house, delivering and fitting house furnish.