Two story building fully renovated outside and inside. Work include roof repair, new guttering system, new roof sofits and front fascia board, replace of all wooden windows with new brown UPVC double glazed windows, new el. system with new fuse box, new pluming, install septic tank, new bathroom, new wooden internal stairs with new wooden railing, new kitchen, plastering and painting inside and outside, new flooring, install new wooden external terrace with wooden railings, install drainage system around the house, install metal railings on outside pathway.
Photo gallery during the construction work
Before the start
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Stage 11
Stage 12
Stage 13
Stage 14
Stage 15
Stage 16
Stage 17
Final stage